In this article 12 sections
- Key takeaways
- What are the Train and Tram Zone Activity Centres?
- Core, inner catchment and outer catchment: what can be built where?
- What is the Built Form Overlay?
- What is the Housing Choice and Transport Zone?
- Do heritage overlays still apply?
- What infrastructure contributions will developers pay?
- How do I check the planning rules for a specific site?
- The order our team works through on a site
- Does the state election change anything?
- Frequently asked questions
- Sources
Quick answer: Victoria has finalised plans for 60 Train and Tram Zone Activity Centres across Melbourne. Each plan sets building heights for a central core (six to 16 storeys in most centres) and lower heights in the surrounding catchment (up to three or four storeys, or up to six on blocks larger than 1,000 square metres in an inner catchment). Before you buy a site in or near one, confirm which area the lot sits in, which zone and overlays apply, and what infrastructure contribution will be charged.
Key takeaways
- Plans for all 60 activity centres are in place, according to the Department of Transport and Planning (page updated 16 October 2026).
- Cores use a new Built Form Overlay with “deemed to comply” standards. Catchments use the new Housing Choice and Transport Zone.
- Heritage overlays are not changed by the new controls, and the program does not involve compulsory land acquisition.
- Infrastructure Contributions Plans start applying to relevant permits from 1 January 2027 (pilot centres) and 1 July 2027 (stages 1 and 2 and the City of Yarra inner zone).
- Housing policy is an issue in the 28 November 2026 state election. Early voting runs 18 to 27 November. This article covers the rules as they stand today.
What are the Train and Tram Zone Activity Centres?
The Train and Tram Zone Activity Centres Program is a Victorian Government planning framework for more homes in and around 60 centres across Melbourne by 2051. The centres sit close to train stations, tram corridors, jobs and services. They range from small neighbourhood centres around a station to large centres with hospitals, universities or major shopping centres.
The Department of Transport and Planning (DTP) says plans for all 60 centres have now been finalised, including the two Inner Melbourne train and tram zones in the City of Yarra and the City of Melbourne. The plans changed the planning controls that apply to land in each centre.
Two points matter for anyone thinking about buying. First, the program does not involve compulsory land acquisition. Second, DTP expects most new homes to be delivered by private landowners and developers over the next 20 to 30 years. The controls say what can be built. They do not build anything.
Core, inner catchment and outer catchment: what can be built where?
Most plans divide a centre into a core and a catchment. Some split the catchment into inner and outer areas. The catchment is the area within roughly a 10 minute walk of the core, about 800 metres. DTP publishes these headline heights:
- Core: heights between six and 16 storeys in most centres, with potential for taller buildings in some places in the larger centres.
- Inner catchment: up to four storeys, and up to six storeys on blocks larger than 1,000 square metres.
- Outer catchment: up to three storeys, and up to four storeys on blocks larger than 1,000 square metres.
Heights step down as you move away from the core so the centre blends into the surrounding suburb. The block size test is the one buyers most often miss: two neighbouring lots consolidated into one block of more than 1,000 square metres can fall under a different height limit than either lot alone. Whether a consolidation is practical is a question for a planner and a lawyer, not a listing description.
What is the Built Form Overlay?
The Built Form Overlay (BFO) applies in activity centre cores. It sets design rules for building heights, setbacks from the street and between neighbours, overshadowing, street activation, landscaping and sustainable design, and what master plans for larger sites must include.
The BFO also brings a streamlined permit pathway. If an application meets the BFO’s “deemed to comply” standards, it cannot be refused a permit on the basis of those standards. Applications for most new buildings in the BFO are not subject to public notice, so council does not need to notify neighbours or consider objections. DTP notes that if notice and review is required under another part of the planning scheme, those provisions still apply. Councils remain the responsible authority in most cases.
What is the Housing Choice and Transport Zone?
The Housing Choice and Transport Zone (HCTZ) applies in the catchments and other well serviced locations. It is designed for townhouses and smaller apartment buildings. Two state codes set the standards:
- The Townhouse and Low-Rise Code applies to two or more dwellings on a lot up to three storeys.
- The Mid-Rise Code applies to two or more dwellings on a lot between four and six storeys.
Both codes cover street setbacks, tree canopy, front fences, access and site coverage, and both include a “deemed to comply” pathway. Unlike the core, notice requirements remain in most cases in the HCTZ, so neighbours can usually still be told about an application.
Do heritage overlays still apply?
Yes. DTP states that the new planning controls do not change existing heritage overlays in these centres. Decision makers must still balance heritage protection with housing, and councils continue to assess permits. A headline height on the activity centre map is not a development right if a heritage overlay or another control limits the site.
Flood risk is also being reworked. DTP says development can still occur outside very high hazard areas, and Melbourne Water is updating its flood modelling. Councils will use that information alongside the activity centre controls when they approve housing in flood affected areas.
What infrastructure contributions will developers pay?
Infrastructure Contributions Plans (ICPs) are the new funding system for these centres. DTP’s funding page (updated 16 November 2026) says:
- ICPs for 54 centres are gazetted and in effect. Plans for Moorabbin, North Brighton, Middle Brighton, Hampton and Sandringham are still being considered.
- The levy applies to relevant planning permits from 1 January 2027 for pilot centres and from 1 July 2027 for stage 1 and stage 2 centres and the Inner Melbourne (City of Yarra) zone.
- No ICP applies to the Inner Melbourne (City of Melbourne) zone because development contributions plans already exist there.
- The standard contribution is $11,350 for each new home, plus $114 per square metre of new commercial space or $57 per square metre of industrial space above a certain size. The rate is indexed each year.
- Councils collect the levy, keep two thirds for local infrastructure and pass one third to the state.
For a site buyer this is a known cost that belongs in the feasibility from day one. A four dwelling project, for example, carries four per dwelling levies before any council specific charges. Run it through a feasibility check before you commit.
How do I check the planning rules for a specific site?
Work through the official tools in this order:
- Find the centre. Use DTP’s interactive activity centre map to see whether the address is in a core, inner catchment or outer catchment, and whether an ICP applies.
- Get the planning property report. VicPlan lists the zone and every overlay on the lot, including heritage, flood and special building overlays.
- Read the centre’s plan. Search DTP’s resource library for the plan for that centre. Check the height, street wall and setback numbers that apply to that block, not the centre’s headline range.
- Measure the land. Confirm the site area on the title plan. The 1,000 square metre threshold changes the catchment height limit.
- Check the title. Covenants, easements and restrictions on title can limit what you can build regardless of the zone.
- Price the levies. Add the ICP contribution per dwelling and any existing development contributions to your costs.
- Get advice before signing. A town planner should confirm the controls for the exact lot, and a solicitor or conveyancer should review the contract and Section 32 vendor statement.
The order our team works through on a site
As a licensed buyers agency, Citadel Agency (estate agent’s licence 092247L) reviews sites for clients who want to develop or hold land near transport. On activity centre sites we work in a fixed order, because the quick desk checks can rule a site out before anyone pays for reports:
- Map before money. We place the lot on the DTP map and VicPlan before booking an inspection. If the site sits outside the core and catchment, the activity centre heights do not apply to it.
- Overlays before height. We read every overlay on the planning property report before we look at the storey limit. A heritage or flood overlay matters more than the headline number.
- Exact block, not centre range. We quote only the controls that apply to that address in writing, never “up to 16 storeys” from a brochure.
- Levy in the first feasibility. The ICP and any other contributions go into the first cost estimate, with the start date that applies to that centre.
- Planner and lawyer before the contract. Our role is to find and test the site; the planning opinion and the legal review come from qualified professionals before anyone signs.
We also check how the suburb fundamentals look for the end product, since planning permission alone does not tell you who will rent or buy the finished homes.
Does the state election change anything?
The Victorian state election is on Saturday 28 November 2026, and the government has been in caretaker mode since 6pm on 3 November 2026. Early voting is open from Wednesday 18 November to Friday 27 November, according to the Victorian Electoral Commission.
The activity centre controls are part of the relevant planning schemes today. Any future government can change planning policy, so anyone buying on the strength of these controls should check the DTP pages again after the election and make sure the contract timing allows for that. We do not comment on party positions. For a plain summary of what each side has announced on housing, see our Victorian election housing policies explainer.
If you are looking at sites across several municipalities, our Victorian council area guides show the council, planning scheme and official sources for each area.
Frequently asked questions
How many Train and Tram Zone Activity Centres are there?
There are 60 centres across Melbourne. DTP says plans for all 60 are now in place, including the Inner Melbourne zones in the City of Yarra and City of Melbourne.
How high can I build in an activity centre catchment?
In an inner catchment, up to four storeys, or up to six on blocks larger than 1,000 square metres. In an outer catchment, up to three storeys, or up to four on blocks larger than 1,000 square metres. Other controls, such as heritage overlays, can still limit a site.
Can neighbours object to a development in an activity centre core?
For most new buildings in the Built Form Overlay there is no public notice, so neighbours are not notified and objections are not considered. Other parts of the planning scheme can still trigger notice. In the Housing Choice and Transport Zone, notice usually still applies.
When does the infrastructure contribution start?
From 1 January 2027 for pilot centres and 1 July 2027 for stage 1 and stage 2 centres and the City of Yarra inner zone. The rate is $11,350 per new home, indexed each year.
Will my property be compulsorily acquired?
No. DTP states the program does not involve compulsory land acquisition. Owners and developers decide whether to build.
Where do I check which controls apply to an address?
Use DTP’s activity centre map and a VicPlan planning property report, then read the plan for that centre in DTP’s resource library. A town planner can confirm the controls for the exact lot.
Thinking about a site near a station or tram line? Book a strategy call with our team and we will walk through the checks with you.
Sources
- DTP: What is the Train and Tram Zone Activity Centres Program? (updated 16 October 2026)
- DTP: How we developed the plans (core and catchment heights, BFO, HCTZ, heritage, flood)
- DTP: Funding infrastructure (updated 16 November 2026)
- Victorian Electoral Commission: 2026 state election voting options
Updated 17 November 2026. General information only. It does not take into account your objectives, financial situation or needs. Speak to a qualified professional before acting.
General information only. It does not take your objectives, financial situation or needs into account and is not financial, tax, credit or legal advice.